Handling Equipment - FRECON A/S - Mechanical Constructions FRECON A/S - Mechanical Constructions

Subject: Construction of mounting equipment for wind turbine hubs.

Content of assignment: Idea generation, 3D design, 2D documentation, bills of materials, analytical strength calculations, FEA, risk assessment, DFMEA, manual, test, prototype production.

In brief: The client had an existing solution that was requested to be optimized especially in relation to manufacturing and mounting cost. Secondary safety was improved.

The solution was a 45% reduction in cost, and the installation time was also optimized. Security was heightened considerably, and the transportation cost was minimized due to a lesser material consumption.

The solution can be transported on a standard truck.